ENHEMS-BUILDINGS
 
 
BEMS DEMONSTRATION ON A TEST-SITE

Results

  • BEMS installed upon the existing building automation system
  • Performed BEMS operation demonstration on a selected energy-intensive building with quantified benefits achieved

 

Activities
A3.1    Test-site assessment
A3.2    Test-site preparation for BEMS demonstration
A3.3    Assessment of BEMS performance on test-site via simulation
A3.4    BEMS commissioning on the test-site
A3.5    Verification of savings and other benefits achieved

 

Deliverables
D3.1.1 Detailed test-site adaptation plan M0
D3.1.2. Formal approvement for test-site adaptation M1
D3.2.1. Mechanical and electrical installations project for test-site adaptation M2
D3.2.2. Installed energy meters on the test-site M4
D3.2.3. The test-site non-invasively improved with installed additional sensors, actuators and controllers M8
D3.2.4. Control computer for execution of BEMS tasks connected with the rest of the installed equipment and with the prototype weather forecast service M12
D3.3.1. Tool for simulation of the BEMS-operated test-site M19
D3.3.2. Analysis of the BEMS-operated building and estimation of achieved gains via simulation M21
D3.4.1. BEMS commissioned on the test-site M14
D3.4.2. BEMS operational log M14

D3.5.1.

Collected and analyzed energy meters readings

continuous from M4,

reports in M12, M23

D3.5.2. Web-site module for following the energy consumption on the test-site M9
D3.5.3. Users satisfaction survey results and analysis M23

 

 


SEARCH
 
PARTNERS
 

 

 

 

 

 

 


FUNDING
 

This action is funded by the European Union


DISCLAIMER
 

This web page has been produced with the assistance of the European Union.

The contents of this web page are the sole responsibility of University of Zagreb Faculty of Electrical Engineering and Computing and can in no way be taken to reflect the views of the European Union.