Activities | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
A1.1 | Establishment of the building modelling infrastructure | |||||||||||||||||||||||
A1.2 | Incorporation of estimation techniques in the BEMS design | |||||||||||||||||||||||
A1.3 | Incorporation of optimal control techniques in BEMS design | |||||||||||||||||||||||
A1.4 | BEMS algorithms implementation in an open building automation platform |
Deliverables | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
D1.1.1 | Technical specifications for the building modelling and simulation software | M0 | ||||||||||||||||||||||||
D1.1.2. | Procurement contract for the building modelling and simulation software with training | M2 | ||||||||||||||||||||||||
D1.1.3. | Operable test-site model | M4 | ||||||||||||||||||||||||
D1.2.1. | Assessment of building variables needed for the BEMS operation on the test-site | M7 | ||||||||||||||||||||||||
D1.2.2. | Systematically developed estimation methods for needed building variables on the test-site | M11 | ||||||||||||||||||||||||
D1.3.1. | Goals and constraints for the BEMS operation on the test-site | M5 | ||||||||||||||||||||||||
D1.3.2. | Systematically developed optimal control strategy for BEMS operation on the test-site | M11 | ||||||||||||||||||||||||
D1.4.1. | Requirements and selection of the open building automation platform | M11 | ||||||||||||||||||||||||
D1.4.2. | Procedure for designed control and estimation algorithms inclusion in an open building automation platform | M12 |